 Past Performance

 

US Army Corps of Engineers - St. Louis District

Wilkinson Island Vegetation Survey - Landuse/Land Cover Assessment
Scope:
   The purpose of this scope of work was to obtain vegetation resource information on the 2800-acre Wilkinson Island Division. The information was used to support planning of the Wilkinson Island EMP project and to support vegetation management decisions on the Division of the St. Louis District

US Army Corps of Engineers - St. Louis District
Navigation and Ecosystem Sustainability Program (NESP) - Systemic Forest Management Plan
Scope:  
The Forest Management Plan project area is designated as the UMRS 500 year floodplain. The lateral extent of the UMRS floodplain ecosystem is generally the river valley lands from toe of bluff to toe of bluff, or to elevated terraces, regardless of ownership. The scope of this plan is for the Corps, working with others, to improve management and restoration efforts along the UMRS, and to seek eventual sustainability of its floodplain forest and other terrestrial habitats.

US Army Corps of Engineers - St. Louis District

Melvin Price Locks and Dam Stationary Hydroacoustic Survey - Auxiliary Lock Upper Mississippi River System Navigation and Ecosystem Sustainability Program Fish Passage

Scope:   The purpose of this study is to examine the suitability of the 600-foot auxiliary lock chamber as a potential fish passage through Melvin Price Locks and Dam at Alton, Illinois.  Data from this study will be incorporated into the Melvin Price Locks and Dam Fish Passage Improvements Ecosystem Restoration Project (hereafter referred to as the Project), which in turn is part of the Upper Mississippi River System, Navigation and Ecosystem Sustainability Program.

US Army Corps of Engineers - St. Louis District

NESP Reno Bottoms Forest Restoration Project Implementation Report

Scope:   Develop a Navigation and Environmental Sustainability Program (NESP), Upper Mississippi River System UMRS over a 50year period that will be implemented in increments through integrated adaptive management

US Army Corps of Engineers - St. Louis District

Identification of Ecoregions in the Upper Mississippi River System Floodplain: Pools 16-26 An Ecological Classification Based on Hydrogeomorphic Attributes
Scope:   Collate and analyze information on: 1) geomorphology, 2) soils, 3) elevation/topography related to flood frequency contours, and 4) river and floodplain hydrology to divide the UMRS into ecologically-based regions similar to the Ecoregion approach used in the MMRRC.

US Army Corps of Engineers - St. Louis District

Pre‚ÄźProject Assessment of Mussels MRM 289.89
D&R Rock Work
Scope:   Investigate the project area for the potential presence of mussels and their habitat; investigate the footprint of the project where direct impacts could occur as well as secondary areas where indirect impacts are possible.

US Army Corps of Engineers - St. Louis District

Forest Resource Survey - Pool 26

Scope:   Obtain forest resource information on approximately 23,000 acres of land on the lower Illinois River and Upper Mississippi River, primarily in Pool 26. The information will be used to support forest management decisions, including the development of an environmental sustainability project to sustain and improve the floodplain forest resource.

US Army Corps of Engineers - St. Louis District

Assessment of Unionids and Habitat for Mooring Cell G2 in Mississippi River Pool 24
Scope:   Identify and characterize unionid mussels within the proposed mooring cell location to determine if mussels exist and their quantities. Investigate the footprint of the project where direct impacts could occur as well as secondary areas where indirect impacts are possible.

US Army Corps of Engineers - Rock Island District

Shallow Water Population Estimate of Freshwater Mussels in Pool 18 Upper Mississippi River

Scope:   Determine the species composition and relative abundance of freshwater mussels in the drawdown impact area and other shallow waters of Pool 18, Upper Mississippi River System

US Army Corps of Engineers - Rock Island District

Pool-Wide Freshwater Mussel Survey, Thalweg and Island Survey, and Construction Impact Relocation : Pool 18
Scope:  To perform ecological and biological services and associated activities along the Upper Mississippi River and its tributaries; document mussel species composition and relative abundance in a proposed main channel, deepwater dredged material placement site

US Army Corps of Engineers - New Orleans District
Flat Lake Water Management Unit

Scope:  To perform Needs Analysis and Inventory Assessment;

Assistance in Public Involvement; Geographical Information Systems (GIS) Data Presentation

US Army Corps of Engineers - New Orleans District

Henderson Lake Water Management Unit

Scope:  To perform Needs Analysis and Inventory Assessment;

Assistance in Public Involvement; Geographical Information Systems (GIS) Data Presentation

US Army Corps of Engineers - New Orleans District

Project Information Report (PIR) Plaquemines Parish East Bank; West Bank; Grand Isle

Scope:  Preparation of Project Information Reports (PIRs)/ Project Description Documents (PDDs) for Non- Federal Levees in Jefferson Parish and Terrebonne Parish.

US Army Corps of Engineers - New Orleans District

Preliminary Planning and Investigation for the Buffalo Cove, Beau Bayou, and Cocodrie Swamp Water Management Units (BBCMU)
Scope:  To perform 1) needs analysis and inventory assessment; 2) plan formulation and alternative solutions; 3) assistance in public involvement; 4) collection and development of GIS database information; and 5) report preparation.

US Army Corps of Engineers - New Orleans District

Preparation of Project Information Reports (PIRs) for Non-Federal Levees In Plaquemines Parish, LA and Terrebonne Parish, LA

Scope:  To develop PIRs for non-Federal levee system on the east and west banks of Plaquemines Parish, and Terrebonne Parish.  Team Southern shall work closely with the Corps in the development of the three (3) PIRs.

US Army Corps of Engineers - New Orleans District

Campaign Plan Implementation Project Management Plan for Collaborative Water Resources Problem Solving

Scope:  To provide technical assistance to develop collaborative,

effective, and efficient approaches to Water Resources problem solving that integrates with sponsor, stakeholder, Federal and State agency efforts for Mississippi River Valley Division, U. S. Army Corps of Engineers

US Army Corps of Engineers - New Orleans District

Provide Flood Plain Management Services (FPMS) Support
Scope:  To provide technical services support to the Corps of Engineers Flood Plain Management Services Program (FPMS) utilizing the Corps of Engineers Floodplain Management database and provide project management support for such projects as Livingston GIS, East Baton Rouge GIS, Alexandria to the Gulf, Houma Navigation Canal, Rosethrowe CAP 205, Goose Bayou CAP 205, and Pailet Basin, LA CAP 205

US Army Corps of Engineers - New Orleans District

Preparation of technical documentation for the Environmental Assessment (EA) and other activities for the non-Federal levee (NFL) system in Terrebonne Parish, Louisiana.

Scope:  To provide assistance for the preparation of an Environmental Assessment for non-Federal levee protection in Terrebonne Parish and assist in determining the suitability of borrow from two locations identified by Terrebonne Parish.